,

Newland wins the tender for the installation of a new ozone plant in Portugal

Newland awarded a new ozone installation in the Roxo DWP.

The supply consists of two units of ozone generation from liquid oxygen and closed loop cooling system.

The total ozone generation capacity is 4 kg/h with a concentration of 10% and prepared to work fully automatically.

The plant is fully automatic with a PLC to control the sequenced operation of all the ozone plant components. Each ozone generator has its own Power Supply Unit with the latest technology in semiconductors.

The ozone is dosed as a function of process water flow with an optimization of the energy and oxygen consumption.

All the installation is monitoring in remote mode by the “SENTINEL” system, allowing us to control the operation and performance of the system.

More information about this installation soon…..